Call our team, 24/7(313) 315-4347
Menu
Call our team, 24/7+1 (313) 315-4347
Motor City Trailer Rental project desk
Project coordination

Request availability

Share the equipment, location, and timing your operation needs. We will review the request without promising inventory or arrival time.

Call now (313) 315-4347
Project inquiry

CITY RENTAL GUIDE

Anthony, New Mexico Modular Kitchen, Dishwashing and Refrigeration Trailer Leasing

Arrange commercial kitchen trailer leasing in Anthony, New Mexico for your operation. Plan cooking and preparation space around your menu, meal volume and service schedule. Confirm the cooking line, power, potable water, drainage and trailer access.

Anthony, New Mexico: school kitchens during Gadsden's bond-funded building years

In Anthony, the Gadsden Independent School District opened a new Gadsden Middle School campus in August 2026 after two years of demolition and construction. Voters also approved a 75 million dollar bond that lists a new Anthony pre-K campus. A district rebuilding on several fronts sometimes needs a plan for meals when a cafeteria goes quiet.

Units for Anthony are dispatched from the Santa Fe warehouse, about 320 miles away. The rental team confirms the route and timing.

A district in the middle of a building cycle

KFOX reported on August 3, 2026 that the 80 million dollar Gadsden Middle School campus in Anthony opened for the new school year, funded with 47 million from the state's Public School Facilities Authority and about 33 million locally. The old campus had served the community for more than 50 years.

The district's bond page says the 75 million dollar measure passed with 79 percent support and lists a new Anthony pre-K campus, plus HVAC, security and accessibility upgrades districtwide. The page gives no construction dates, so kitchen planning starts with a call to the district.

A ten-day cafeteria gap in Anthony

A cafeteria at a district campus in Anthony is closed for ten days of HVAC and floor work during a school break. The nutrition department still needs to serve breakfast and lunch to a summer program on site, so staff look at a temporary kitchen with a dishwashing unit parked outside the gym.

Rental schedule: 8 to 14 days

  • 28 ft mobile kitchen: $4,995 to $7,995 per month
  • 22 to 26 ft low temperature dishwashing trailer: starting at $4,995 per month

The rental team prices the actual term, site and delivery.

What the new campus says about school kitchens

Gadsden Middle School opens new campus as students start year in newly built facility ↗

KFOX14, August 3, 2026

The new Gadsden Middle School campus in Anthony opened with the school year after two years of demolition and construction. The state's Public School Facilities Authority paid 47 million dollars and the district about 33 million. It adds a turf field and a library media center, and sixth graders join the school.

For a kitchen rental: If the district's remaining bond projects take a campus kitchen offline, a temporary kitchen could be one way to keep meals going while work continues.

A rebuild at this scale also resets how a campus serves food, with a new library media center and turf field now part of daily life. Where bond work keeps older buildings under repair, kitchens can be the system that goes offline. If that happens, the nutrition office would want details on meal counts, serving hours and hookups before a trailer is considered.

Kitchen options for school service

A prep kitchen supports a satellite serving line, and a full kitchen covers cooking on site.

38 ft mobile kitchen

  • Deep Fryer
  • Single stack convection oven
  • Griddle oven combination
  • 6 Burner Range Oven Combination
  • Handwashing sink
  • 3 Compartment sink
  • Prep Table
  • Reach in Ref and Freezer

Power: 220V single phase, 200-220 amps

26 ft prep kitchen

  • 3-Compartment Sink
  • Handwashing Sink
  • Prep Table
  • Mop Sink
  • Reach in Ref and Freezer
  • Water Heater

Power: 220V single phase, 200 amps

Site and weather points for an Anthony campus

  • The National Weather Service Albuquerque office puts the monsoon between June 15 and September 30, a stretch that overlaps summer school and construction.
  • The same weather service page explains flash flood watches and warnings, so choose a spot away from low drainage paths on the school grounds.
  • Anthony is in Dona Ana County, so ask the nearest environment department field office how a temporary school kitchen is permitted.
  • Ask the school district's facilities office which fire authority inspects, whether the campus has a gas line, and where the nearest 220V service sits.

Planning order for a district kitchen

  1. Call the district Reach Gadsden ISD at 575-882-6200 and ask which campus or kitchen is affected and for how long.
  2. Permit Ask the environment department's field office about plan review and a pre-opening inspection; its FAQ says a plan-approval letter should come before construction.
  3. Site Choose a firm, high spot near the cafeteria that stays clear of buses and drop-off lines.
  4. Power and delivery Confirm 220V service and let the rental team confirm routing and access.
GET A QUOTE

Rent a kitchen trailer in Anthony

Send the site address, expected meals per day, start date and utility connections. The rental team confirms the kitchen size, delivery route and availability for Anthony, New Mexico.